A developer has plans to build one of Boston’s tallest buildings in downtown’s Financial District. The 740-foot glass tower will include a 300-room hotel, offices, retail space, a restaurant and 150 luxury condominium units. Costing as much as $900 million to build, the 900,000-SF skyscraper will add a new showpiece to Boston’s rapidly changing skyline.
The building would be the tallest building in the downtown area and will include a 300-room hotel, retail space, offices, and up to 150 condominiums on the upper floors.
The tower proposal comes during one of the most dynamic periods of construction in the city’s history, as numerous skyscrapers aim to alter the Boston skyline.
At 740 feet, the angular skyscraper would be Boston’s third-tallest structure, behind the 750-foot Prudential building and the 790-foot John Hancock Tower.
An office building at 133 Federal Street would be combined with the new tower at ground level to create a 72,000-square-foot lobby with restaurants and shops.
The complex, called 111 Federal Street will rise on one of the Financial District’s last major development sites, replacing the city-owned Winthrop Square parking garage presently on the site.
Before work can proceed, developer Steve Belkin must negotiate a deal to buy the property from the city.
The dilapidated garage at 111-115 Federal Street will be demolished and replaced with glass storefronts and modern lobbies for the offices and a luxury hotel.
Former Mayor Thomas Menino selected Steve Belkin to redevelop the property in 2006, but the project failed to attract enough tenants amid the economic downturn.
The original plan called for a 1,000-foot office tower, but that proposal was rejected because it would have interfered with air traffic. The new proposal calls for a tower 260 feet shorter.
The building will be one of only a few towers built in the densely packed Financial District since the 1980s. In recent years, tech companies, restaurants and retailers have brought new life to the area.
The project, designed by Boston-based CBT Architects, is expected to begin construction in the fall of 2015.
No comments:
Post a Comment